Core Scientific (CORZ) · Deep analysis

Report previewCORZ.USReport date Last updated
← Back to reports
Report contents
01

Business model

Business model: a power landlord still paid by bitcoin

Core Scientific sells two things from the same industrial asset: bitcoin it mines for its own account, and powered floor space it rents to other people's machines. Self-mined coins reach the company through mining pools, so the price is set by the block subsidy plus transaction fees and by network difficulty; there is no customer to negotiate with. Hosting is a fee per kilowatt-hour paid by a tenant that owns the hardware. Since 2024 the hosting book has been refilled with AI and high-performance computing customers on multi-year contracts, with CoreWeave as anchor tenant. Read it as a cyclical resource producer, converting cheap electricity into bitcoin, that is rebuilding itself as a data-center lessor. It is in expansion, paid for partly out of the operations of a business that emerged from Chapter 11 in January 2024.

The two revenue lines respond to opposite forces. Mining revenue is hashrate times hashprice, the market rate for a unit of computing power; power is the largest cash cost, so margins compress whenever the network's total hashrate grows faster than the bitcoin price. Hosting revenue is contracted megawatts times a rate with escalators: it sacrifices bitcoin upside in return for a spread between rent and the cost of electricity, land, transformers and the switchgear behind the meter. Whether that trade is worth making depends on contracted yield against the all-in cost of the retrofit, and only secondarily on where bitcoin trades. A megawatt committed to a fifteen-year HPC lease cannot be redirected if hashprice spikes, so the mix decision is effectively irreversible once the concrete is poured.

The scarce asset is the interconnection, not the shell. Permitted land, a utility agreement and energized capacity take years to assemble, and the company's sites in Georgia, Kentucky, North Dakota and Texas already have them. That gives it leverage with tenants in a market where grid capacity is short. The leverage runs one way only: a landlord with a single very large tenant at a site has little pricing power at renewal if no alternative customer can absorb that much capacity on that timetable. Public filings do not break out contract-level pricing, renewal terms or site-level power costs, so the spread on a converted site has to be inferred from segment revenue and total cost of revenue. That limits how precisely the shift can be underwritten from outside.

Who pays, and how much that concentration costs, is the question the segment disclosure answers least well. The paying customers are now a handful of large AI cloud operators rather than dozens of small crypto miners, which raises revenue quality and concentration at the same time. A single counterparty signing for several hundred megawatts is better credit than a retail miner and far harder to replace. Some of the buildout is tenant-funded through prepayments and contributions, which reduces the company's own capex but ties the construction schedule to the tenant's own deployment plans; a slowdown at the customer shows up as a slowdown in reported energization.

The profit pool is not obviously protected. Almost every listed miner with a grid connection has announced some version of the same conversion, and the large cloud buyers know it. Scarcity rent accrues to whoever can deliver energized, liquid-cooled capacity soonest at the lowest power cost, which puts a premium on utility relationships and construction execution and pushes the returns toward the cost of capital once the queue of convertible sites lengthens. Core Scientific's advantage is time-to-power at existing sites and an early anchor contract; its disadvantage is that the same contract that validates the strategy also sets the ceiling on what it can charge the next tenant.

Fragility sits in two places. The first is hashprice. The April 2024 halving cut the per-block subsidy, and the self-mining fleet only earns its keep when the coin price covers power plus the efficiency penalty of older machines. Curtailment programs, where the company powers down and is compensated by the grid, blunt that risk and turn the power contract into an option; they do not remove it, and heavy curtailment also means fewer coins mined. The second is execution. Converting a building from air-cooled bitcoin racks to liquid-cooled HPC halls and then energizing on a utility's timetable is a construction business with penalty clauses attached. Capital intensity rises with every conversion, and the funding has to be committed before the rent starts.

The evidence that would overturn this assessment is a sustained stretch in which contracted HPC capacity is energized on schedule and the mining segment still covers its power bill. That combination would show the two halves reinforce each other instead of competing for the same megawatts and the same balance sheet. The failure case is equally concrete: repeated delivery-date amendments on the anchor contracts, or a hashprice collapse that forces curtailment at sites already promised to tenants.

Questions worth following

  • Will Core Scientific energize its contracted HPC capacity on schedule?

    The hosting contracts only become cash flow once halls are converted and the utility energizes them. Slippage pushes rent further out while interest and construction costs accrue, and it tests whether the company can operate as a construction and facilities business, not just a power trader.

  • Can Core Scientific's self-mining fleet still cover its power bill?

    Mining is the segment that pays the bills during the hosting buildout and the one exposed to a halving. If hashprice falls below site power cost for long, curtailment spreads and the internal funding for conversions weakens, changing how much external capital the transition needs.

  • Is Core Scientific adding HPC tenants beyond its anchor customer?

    A second and third creditworthy tenant would confirm the sites are a saleable product and reduce renewal risk on the largest contract. Continued single-customer dependence would leave pricing and occupancy at the mercy of one counterparty's capital spending plans.

02

Financial quality

Financial quality: capex is financed, not yet earned

Earnings quality: Weak. Core Scientific builds and operates data-center capacity and sells the computing output. In the quarter ended September 30, 2026 it reported $0.23 billion of revenue, $0.07 billion of operating income, and $1.18 billion of net income. A year earlier that same quarter carried $0.08 billion of revenue, a $0.07 billion operating loss, and a $0.15 billion net loss. The $1.11 billion distance between operating income and reported profit in the latest quarter accounts for the swing, and the data centers did not produce it.

USD bn unless notedFY2021FY2022FY2023FY2024FY2025Q4 FY2026Assessment
Revenue0.540.640.500.510.320.23Adequate
Gross margin (%)43.91.324.623.711.952.9Adequate
Operating income0.17(0.25)0.01(0.02)(0.23)0.07Very weak
Net income0.05(2.15)(0.25)(1.31)(0.29)1.18Very weak
Net margin (%)8.7(335.2)(49.1)(257.5)(90.5)505.9Very weak
Operating cash flow(0.06)0.200.070.040.280.07Adequate
Capex, implied (OCF − FCF)0.060.600.020.090.730.54Very weak
Free cash flow(0.12)(0.40)0.05(0.05)(0.45)(0.47)Very weak
Total liabilities1.101.221.312.423.317.03Very weak
Total equity1.34(0.41)(0.60)(0.82)(0.96)(1.09)Very weak
Current ratio (x)2.360.460.206.721.150.67Weak
ROA (%)3.6(132.2)(32.4)(113.8)(14.6)21.1Weak

*Three months ended September 30, 2026. Flow items are single-quarter figures and are not annualized; ratios are quarterly.

USD bn unless notedRevenueOp. incomeNet incomeOCFCapexFCFAssetsLiabilitiesEquityCurrent ratioAssessmentTrend
Q1 FY2025 (Dec 2024)0.10(0.04)(0.27)0.010.02(0.01)1.602.42(0.82)6.72WeakStable
Q2 FY2025 (Mar 2025)0.08(0.05)0.58(0.04)0.09(0.13)1.621.81(0.18)4.26WeakMixed
Q3 FY2025 (Jun 2025)0.08(0.03)(0.94)0.030.12(0.09)1.983.04(1.06)1.79Very weakDeteriorating
Q4 FY2025 (Sep 2025)0.08(0.07)(0.15)0.130.25(0.12)2.303.42(1.13)1.58WeakStable
Q1 FY2026 (Dec 2025)0.080.010.210.150.27(0.12)2.353.31(0.96)1.15WeakMixed
Q2 FY2026 (Mar 2026)0.11(0.02)(0.35)0.250.39(0.14)3.074.38(1.31)0.55WeakDeteriorating
Q3 FY2026 (Jun 2026)0.16(0.07)(1.16)(0.02)0.56(0.58)5.267.68(2.42)0.89Very weakDeteriorating
Q4 FY2026 (Sep 2026)0.230.071.180.070.54(0.47)5.947.03(1.09)0.67WeakMixed
Reported profit: mostly a mark, not a margin

In the September 2026 quarter, EBIT was $1.11 billion and EBITDA $1.12 billion against $0.07 billion of operating income. Roughly $1.0 billion landed outside operating income, which is consistent with fair-value marks on warrants or convertible instruments; the reported line item would confirm it. The same entry ran in reverse three months earlier, when a $0.07 billion operating loss became a $1.16 billion net loss. Net margin, EBITDA multiples and P/E are not measuring this business until that line is stripped out.

Return on equity makes the same point. ROE was 185.6% in FY2024 and 32.4% in FY2025, both years with negative shareholders' equity: the ratio is arithmetic on a negative denominator. Return on assets, at -14.6% in FY2025, is the plainer measure. Cash is cleaner still. Operating cash flow has been positive in four of the last five fiscal years and rose from $0.04 billion in FY2024 to $0.28 billion in FY2025.

Capex runs at roughly twice revenue

Implied capex climbed from $0.09 billion in FY2024 to $0.73 billion in FY2025 and reached $0.54 billion in the September 2026 quarter alone, a pace above $2 billion a year. Revenue in that quarter was $0.23 billion. In FY2025, revenue equaled about a tenth of period-end assets ($0.32 billion against $2.35 billion), and assets have since grown to $5.94 billion. Capital is being committed well ahead of the revenue it is meant to generate.

The favorable reading is contracted, higher-margin capacity entering service. Gross margin went from 4.7% in the September 2025 quarter to 52.9% a year later while quarterly revenue nearly tripled, which is what a mix shift toward hosting would look like. It is also what a change in where depreciation and power costs are booked would look like, and the summary figures do not settle which. Non-cash charges are large either way: in FY2025 operating cash flow of $0.28 billion exceeded operating income by $0.51 billion, mostly depreciation. If gross margin near 50% holds as capacity ramps, operating income can begin covering depreciation and interest. A slide back toward single digits would mean the build-out is absorbing capital without earning a return.

Negative equity and thin liquidity

Liabilities of $7.03 billion against $5.94 billion of assets left equity at -$1.09 billion on September 30, 2026; equity has been negative at every fiscal year-end since 2022. Long-term debt rose from $1.06 billion in March 2026 to $4.30 billion in June 2026, and the four most recent quarters pulled in about $3.18 billion of financing. Cash was $0.80 billion against $2.11 billion of current liabilities, a current ratio of 0.67 versus 1.58 a year earlier, and investing outflows of $0.98 billion in the September quarter alone cut cash from $1.77 billion.

That structure leaves the company dependent on continued access to capital. Insolvency is not the near-term issue, since quarterly operating cash flow is positive; the terms of the next raise decide how much of the new capacity accrues to current holders.

What to check

Three items would change the reading. The size and reversibility of the fair-value line decide whether reported earnings ever become useful for valuation. Capacity energized and contracted, alongside revenue per unit of capacity, would show whether the capex is producing billable assets or idle ones. And the maturity schedule behind the $4.30 billion of long-term debt, plus any covenants tied to the current ratio, will set the price of the next refinancing.

Questions worth following

  • Will Core Scientific's new data-center capacity earn a return on capex?

    Capex has outrun revenue, and revenue equals roughly a tenth of assets. If new capacity leases at contracted rates, operating income can cover depreciation and interest; if it sits idle or prices weakly, spending dilutes returns and pushes more financing onto the balance sheet.

  • Is Core Scientific's gross-margin improvement durable?

    Gross margin moved from 4.7% to 52.9% year over year while quarterly revenue nearly tripled. If that reflects contracted hosting economics, operating profit can follow; if it reflects cost classification or a one-off power benefit, the gain reverses as more capacity comes online.

  • Can Core Scientific refinance its debt without heavy dilution?

    Liabilities exceed assets by about $1.1 billion, the current ratio is 0.67, and capex still outruns operating cash flow. The terms of the next debt or equity raise determine whether existing holders keep most of the upside from new capacity or give it away to fund construction.

Generated by DeepVal AI. Data and models may contain errors or be outdated. For research only; not personalized investment advice.

Go beyond the preview

Continue reading the full report

  1. Key risksWhat could break the investment case
  2. Valuation and margin of safetyWhat the current price assumes, and how much room for error it leaves
  3. SummaryOur overall judgement and what to watch next

Free to sign up · 20 research points · unlocking this report uses 10

20 points cover 2 full reports. No card needed.

Research reflects its generation date. Preview the first two modules.

More on Core Scientific, Inc. Common Stock